JT/T 0025-1992 沿海港口企业能量平衡导则

作者:标准资料网 时间:2024-05-23 23:08:19   浏览:8744   来源:标准资料网
下载地址: 点击此处下载
基本信息
标准名称:沿海港口企业能量平衡导则
英文名称:Energy balance guidance for coastal port enterprises
中标分类: 公路、水路运输 >> 公路、水路运输综合 >> 技术管理
替代情况:被JT/T 25-2009代替
发布部门:中华人民共和国交通部
发布日期:1992-02-11
实施日期:1992-07-01
首发日期:
作废日期:2009-11-01
提出单位:中华人民共和国交通部能源办公室
归口单位:交通部标准计量委员会
起草单位:上海、大连、秦皇岛港务局
起草人:邱瑞炼、胡逢春、陈葆亮、于淑敏、刘舒芳
出版社:人民交通出版社
出版日期:1992-07-01
页数:10页
适用范围

本标准规定了能量平衡的原则。
本标堆适用于铅海港口企业。

前言

没有内容

目录

没有内容

引用标准

没有内容

所属分类: 公路 水路运输 公路 水路运输综合 技术管理
下载地址: 点击此处下载
Product Code:SAE AMS4082
Title:Aluminum Alloy, Seamless Drawn Tubing, 1.0Mg - 0.60Si - 0.28Cu - 0.20Cr (6061-T6) Solution and Precipitation Heat Treated
Issuing Committee:Ams D Nonferrous Alloys Committee
Scope:This specification covers an aluminum alloy in the form of seamless, drawn tubing.Product Code:SAE J1942/1
Title:Qualified Hoses for Marine Applications
Issuing Committee:Hydraulic Hose And Hose Fittings Committee
Scope:Effective August 28, 1991, the SAE replaced the USCG as the listing agency for Marine Hose Assemblies. The previous USCG list was discontinued as of December 31, 1992, and is being replaced by this SAE listing, J1942-1.All products appearing on the USCG list as of December 31, 1992, may be carried over to the SAE J1942-1 provided they meet the new test requirements listed in SAE J1942.If your products comply, you may retain your listings with no additional testing. (Please note that the USCG has the authority to request and inspect your test results at their discretion.)The following list consists of hose data provided as of May 2003, and is for convenience in determining acceptability of nonmetallic flexible hose assemblies intended for usage under 46 CFR 56.60-25(c). Where the maximum allowable working pressure (MAWP) or type of fitting is not specified, use the manufacturer's recommended MAWP or type of fitting. This list has been compiled by SAE Staff from information provided by the manufacturers whose product listings appear in this document.Manufacturers wishing to list their products in this document shall:a. Successfully test their hose to the requirements of SAE J1942, Table 1.b. Submit a letter of certification to the SAE J1942 test requirements for each specific type of hose tested. All sizes should be included in the same letter which must also include all of the information necessary to make a SAE J1942-1 listing.c. The SAE will review the letter and may, at their discretion, request to see some, or all, of the test results. A copy of the submittal letter marked 驴Accepted For Listing驴 will be returned to the applicant and a duplicate copy sent to the USCG.d. The cutoff date for inclusion of a hose listing in the annual SAE Handbook is April 30, of the preceding year. However, listed hoses may be used on vessels as soon as the 驴Accepted For Listing驴 letter is issued by the SAE.Next publication of this listing is scheduled to take place on December 2003. If you wish to include additional hoses in the 2003 publication of this list, please submit your Certified List to SAE Headquarters by October 2003.